Written for first-time buyers and for engineers who want to check whether a supplier's reasoning holds. No catalogue numbers, no sales copy — the decisions that change cost and performance.
Three inputs first, room list second, equipment last — plus five decisions that are expensive to correct once the room is built.
Read →
Chilled, frozen, blast, controlled atmosphere, pharma, ultra-low and processing rooms — and what each band changes in panels, coils and defrost.
Read →
Temperature zones and system design for meat plants, following the Chinese national hygiene standard GB 12694-2016.
Read →
Which line items move the price most, and where cutting corners shows up two years later. Published after we finish checking the cost breakdown against current projects.
How to tell which unit arrangement suits your load profile, without arguing about brands.
Fin spacing, defrost cycles, door traffic and humidity — the four usual causes, and which one is yours.
We publish when the numbers are verified, not to keep a posting schedule. If you need one of these now, ask and we will send a draft.